How to Install a Ferris Wheel ?



 I. Site Preparation


1. Select the Site: Choose a location that considers factors such as foot traffic, site size, and the surrounding environment. Opt for a flat, spacious area suitable for amusement rides.

2. Site Measurement: Once the site is determined, measure its length, width, and height to aid in subsequent design and construction.

3. Site Clearing: Clear the site of debris, grass, shrubs, and other obstacles. If there are protruding objects, either remove them or cover them to protect the site.


II. Foundation Treatment


1. Measure the Foundation: After clearing the site, measure the foundation's height and location. Ensure the measurements match the Ferris wheel's dimensions to guarantee stability.

2. Excavate the Foundation: Excavate the foundation according to the Ferris wheel's size and design requirements. During excavation, measure and control the foundation's quality and depth to avoid insufficient load-bearing or unnecessary depth.

3. Fill the Foundation with Materials: As needed, load the foundation with filling materials to reinforce it.


III. Track Installation


1. Fix the Track: After foundation treatment, installing the track is a crucial step. Ensure the track's installation position aligns with the inner part of the foundation and maintains flatness and level.

2. Connect the Track: After installing the track, add connecting tracks to facilitate smooth wheel rotation and ensure flat contact points.


 IV. Column Installation


1. Install the Supports: Install supports to bear the Ferris wheel's weight and load. Fix the supports above the corresponding track positions and ensure equal height.

2. Install the Base: Install the base and connect it to the supports for stable connections and secure fixation of the Ferris wheel.

3. Secure the Columns: After connecting the base and supports, secure the columns to ensure the Ferris wheel's safety and stability.


V. Drive Mechanism Installation


1. Install the Drive Device: The drive device should be placed at a higher position on the track for energy output. Ensure the drive device's flatness and stability during installation.

2. Install the Transmission Mechanism: Install the transmission mechanism at the interface connecting the drive device and track to achieve a reasonable connection between the track and the Ferris wheel.

3. Connect the Power Supply: Connect the drive device to the power supply to ensure the Ferris wheel's normal operation.


VI. Test Run and Adjustment


1. Inspect Equipment Installation Quality: After installation, conduct a rigorous quality inspection. Check tire pressure, wheel alignment, drive device, and system operation.

2. Test Run and Adjustment: After passing the installation quality inspection, perform a test run and adjustments. During the test run and adjustments, prioritize safety, stability, and smooth operation, avoiding overloading and improper operations.


prev
​The Structure of a Ferris Wheel
How to plan and design an unpowered playground?
next
recommended for you
no data
Get in touch with us
We are a professional manufacturer integrating the design, development and manufacture of new amusement equipment in small and medium-sized enterprises.
Contact: Leyna
Tel: 86-20-36252999   
Fax: 86-20-36252333
Mob: 86-13928733287
Add: No. 17, Jiafu Road, Jiafu Industrial Zone, No. 2, Yinzhong Road, Qingyuan High-tech Zone, Guangdong, China
Integrated amusement equipment manufacturer specializing in R&D, production, sales, and service.
Tel:86-20-36252999     Mob:86-13928733287
Copyright © 2025 LETIAN | Sitemap | Privacy Policy
Customer service
detect